2025-12-29
(26/02/23)
- KYS: Maintenance (2025.09.01. ~ ).
The CTR will be available in Mar. 2026. The 150/230 GHz receiver will probably be ready in 2027, but a firm schedule has yet be finalized.
- KUS: Operation.
- KTN: Operation. [OCTAD PLO unlock problem; 2026.02.04, 2026.02.07, 2026.02.20.-23; OCTAD replaced at 23rd Feb.].
- KPC: Operation. [Subreflector control problem; 2025.12.26.~31., 2026.02.03.~12.].
The 150/230 GHz receivers will be available in the 26B season and Mar. 2026, respectively.